日本語 English 中文

MRP glossary TOP > Material Planning > Calculating Fixed Lead Time

Calculating Fixed Lead Time

It is a method to calculate a lead time, where the lead time set in an item is thought to be fixed, and the Planned Release Date is calculated using the delivery date of the order, as shown in the following formula:

Planned Release Date = Delivery Date - (Lead Time + Safety Lead Time)


Related term: Calculating Lead Time

Reference:JIT Business Research Mr. Hirano Hiroyuki

Bucket | Material Planning | Calculating Gross Requirements