日本語 English 中文

MRP glossary TOP > Engineering Data Control > Paper Lead Time

Paper Lead Time

Paper Lead Time

It is a period ranging from presenting the sales plan from giving actual manufacturing instructions or issuing the order. During this period, the coordination with the sales division, the consideration of the production capacity, the production and materials planning, and etc. are performed. These activities are carried out on the desk, and thus the period required for them is called Paper Lead Time.

mrp_173-1.jpg
Related term: Lead Time

Reference:JIT Business Research Mr. Hirano Hiroyuki

P/S | Engineering Data Control | Parent Item